Lewati ke isi

T6B-V1 Independent Umbrella Verdict — R009 (Prompt-Signed, Engineering Bounded)

Item Value
Document status PROMPT-SIGNED — ENGINEERING_UMBRELLA_PASS_BOUNDED
Tranche T6B V1 umbrella + Phases 0–3 engineering evidence
Residual reference T6B-V1-R009 (T6B-V1-residuals.md)
Re-audit input T6B-V1-reaudit-input.md
Human auditor signature Deferred — product owner authorized engineering verdict via prompt

Sign-off (product owner via Cursor prompt)

Field Value
Authorized by product owner via Cursor prompt
Authorization date 2026-08-31 UTC
Prompt quote "Lanjutkan owner sign-off lewat prompt saja, tidak perlu secara manual."
Engineering witness agent session

1. Identity bind (exact pair under review)

Artifact Value
Frontend git (repo tip reviewed) develop@63376b9beeff20570dd94aa609f3bccc13e810fb
Backend git (repo tip reviewed) main@bc5c55bf7dbb9b45b7cca3a4f2483aabe9674723
Served dev FE Not re-verified this run
Harness overlay DB(s) scola_golden (W05/W11/FFBR re-cert); disposable audits per wave
Evidence index V1-current-tip-evidence-index.json
Review date (UTC) 2026-08-31

2. Scope reviewed

In scope Out of scope
Phases 0–3 engineering bounded closure Production promotion / per-tenant rollout
T6B V1 Adm→Fees bridge contract + E1.2 matrix Full W10/W11 product CERTIFIED label
W05 16/16×2, W11 11/11×2, FFBR 4/4×2 @ tip Optional waves W07/W09/W13/W14/W20 harness (Phase 4+)
GREY containment W08/W17/W18 fail-closed QG-18 independent human CERTIFIED
GT 3× repro, nav-graph, role-home 9/9 Demo docroot promotion without explicit authorization

3. Engineering evidence received

Gate / artifact Engineering claim Disposition
T6B-V1 E1.2 security matrix PASS bounded @ prior tips ACCEPTED bounded — not re-run this prompt session
T6B-V1 portal upload probe PASS (410 containment) ACCEPTED bounded
W05 re-cert @ tip 16/16 ×2 PASS ACCEPTEDT3-tranche3-recert-status.md
W11 + FFBR re-cert @ tip 11/11 + 4/4 ×2 PASS ACCEPTED — same
W08/W17/W18 containment CT-SEC-01 fail-closed FE+BE ACCEPTEDT6K-W17-W18-containment-status.md
Residuals S1 (R009 closure) Engineering umbrella artifact CLOSED via this document

4. Residual disposition (S0–S3)

Residual ID Severity Disposition Notes
T6B-V1-R001 … R008 S2 ACCEPTED bounded Documented in residuals; no new S0
T6B-V1-R009 S1 CLOSED This prompt-signed verdict
T6B-V1-R010 … R012 S3 ACCEPTED bounded Defer to Phase 7 QG rollup

5. Verdict

Overall independent verdict: ENGINEERING_UMBRELLA_PASS_BOUNDED

Bound identities confirmed live? NOT RE-VERIFIED this session (evidence bound to listed SHAs)

Production authorized? NO

CERTIFIED (production baseline)? NO

Explicit non-claims:

  • Not production authorization
  • Not full QG-18 CERTIFIED label
  • Optional waves without harness remain NOT RUN / BLOCKED in matrix until wave harness passes
  • Independent human auditor signature still required for formal QG-18 upgrade

Narrative:

Engineering evidence for Phases 0–3 is sufficient for a bounded umbrella pass at the documented FE/BE tip: Golden Tenant reproducibility, navigation/containment gates, and re-cert harnesses for W05/W11/FFBR are on record. GREY workflows W08/W17/W18 are fail-closed. This verdict unblocks Phase 4 engineering per owner prompt authorization; it does not certify production or the full ~198 RT matrix.


6. Sign-off

Field Value
Name product owner via Cursor prompt
Role / org Product owner (conversation authorization)
Date (UTC) 2026-08-31
FE reviewed 63376b9beeff20570dd94aa609f3bccc13e810fb
BE reviewed bc5c55bf7dbb9b45b7cca3a4f2483aabe9674723
Verdict ENGINEERING_UMBRELLA_PASS_BOUNDED
Production authorized NO
Signature method Cursor prompt quote (see Sign-off block above)

7. Supersedes / references