T6B-V1 Independent Umbrella Verdict — DRAFT (R009)¶
| Item | Value |
|---|---|
| Document status | DRAFT — NOT SIGNED |
| Tranche | T6B V1 (Adm→Fees bridge payung) |
| Residual reference | T6B-V1-R009 (T6B-V1-residuals.md) |
| Re-audit input | T6B-V1-reaudit-input.md |
| Human signature | ABSENT — auditor must complete §Sign-off |
Auditor instructions: Fill every
[AUDITOR: …]placeholder. Do not copy engineering PASS claims without reviewing bound evidence JSON at the exact FE/BE pair listed below. Remove theDRAFTsuffix from the filename only after signature.
1. Identity bind (exact pair under review)¶
| Artifact | Value |
|---|---|
| Frontend git (repo tip reviewed) | [AUDITOR: FE SHA] |
| Backend git (repo tip reviewed) | [AUDITOR: BE SHA] |
| Served dev FE (if applicable) | [AUDITOR: served FE SHA or N/A] |
| Served demo FE (if applicable) | [AUDITOR: served FE SHA or N/A] |
| Harness overlay DB(s) | [AUDITOR: disposable DB name(s)] |
| Evidence index | [AUDITOR: path to evidence JSON bundle] |
| Review date (UTC) | [AUDITOR: ISO-8601] |
2. Scope reviewed¶
| In scope | Out of scope |
|---|---|
T6B V1 Adm→Fees bridge contract (T6B-V1-runtime-manifest.json) |
T6C–T6K waves |
| E1.2 security matrix @ bound identity | Production promotion |
| Portal upload probe (410 containment) | Full W10/W11 product certification |
| Residuals S0–S1 disposition | Demo docroot promotion without explicit authorization |
3. Engineering evidence received (do not treat as PASS until reviewed)¶
| Gate / artifact | Engineering claim | Auditor disposition |
|---|---|---|
| T6B-V1 E1.2 security matrix | [AUDITOR: PASS / FAIL / NOT REVIEWED] |
[AUDITOR: notes] |
| T6B-V1 portal upload probe | [AUDITOR: PASS / FAIL / NOT REVIEWED] |
[AUDITOR: notes] |
| Runtime manifest parity | [AUDITOR: PASS / FAIL / NOT REVIEWED] |
[AUDITOR: notes] |
| Residuals S1 (R009 closure) | [AUDITOR: OPEN / CLOSED] |
[AUDITOR: notes] |
4. Residual disposition (S0–S3)¶
| Residual ID | Severity | Auditor disposition | Notes |
|---|---|---|---|
| T6B-V1-R001 | S2 | [AUDITOR: OPEN / ACCEPTED / CLOSED] |
|
| T6B-V1-R002 | S2 | [AUDITOR: OPEN / ACCEPTED / CLOSED] |
|
| T6B-V1-R003 | S2 | [AUDITOR: OPEN / ACCEPTED / CLOSED] |
|
| T6B-V1-R004 | S3 | [AUDITOR: OPEN / ACCEPTED / CLOSED] |
|
| T6B-V1-R005 | S2 | [AUDITOR: OPEN / ACCEPTED / CLOSED] |
|
| T6B-V1-R006 | S3 | [AUDITOR: OPEN / ACCEPTED / CLOSED] |
|
| T6B-V1-R007 | S2 | [AUDITOR: OPEN / ACCEPTED / CLOSED] |
|
| T6B-V1-R008 | S2 | [AUDITOR: OPEN / ACCEPTED / CLOSED] |
|
| T6B-V1-R009 | S1 | [AUDITOR: OPEN / CLOSED] |
This verdict closes R009 when signed |
| T6B-V1-R010 | S3 | [AUDITOR: OPEN / ACCEPTED / CLOSED] |
|
| T6B-V1-R011 | S3 | [AUDITOR: OPEN / ACCEPTED / CLOSED] |
|
| T6B-V1-R012 | S3 | [AUDITOR: OPEN / ACCEPTED / CLOSED] |
5. Verdict¶
Overall independent verdict: [AUDITOR: PASS (bounded) / FAIL / DEFER]
Bound identities confirmed live? [AUDITOR: YES / NO / NOT VERIFIED]
Production authorized? NO (unless explicit separate authorization documented elsewhere)
CERTIFIED (production baseline)? NO
Narrative (auditor):
[AUDITOR: 2–5 sentences explaining verdict, residual acceptance, and any blocking findings]
6. Sign-off (required for R009 closure)¶
Name: [AUDITOR: full name]
Role / org: [AUDITOR: role and organization]
Date (UTC): [AUDITOR: ISO-8601]
Exact pair reviewed:
FE: [AUDITOR: SHA]
BE: [AUDITOR: SHA]
Overlay DB: [AUDITOR: name or N/A]
Verdict: [AUDITOR: PASS (bounded) / FAIL / DEFER]
Production authorized: NO
Signature: [AUDITOR: signature method — wet / GPG / authorized chat reference]
7. Supersedes / references¶
- Prior unsigned reference: execution docs citing
audit/T6B-V1-independent-umbrella-verdict-20260818.md(never committed) - Related signed rebind (T6B.2, separate scope):
T6B2-independent-verdict-20260829.md - Engineering status:
T6B-result.md