Lewati ke isi

V1 Current-Tip Independent Verdict (Engineering Assessment + Human Pointer)

Status: GO_DEMO_RC (human-signed for bounded demo RC; this file remains engineering pointer)
Date: 2026-08-26 (refreshed after V1F-002 DONE + V1F-001/003 SIGNED)
Auditor (this draft): AI engineering assessment — not a substitute for signed human files
Human signed verdicts:
- V1-current-tip-human-verdict-20260826.mdSIGNED GO_DEMO_RC
- T6B2-independent-verdict-20260826.mdSIGNED PASS
Handoff: ../execution/V1-HUMAN-AUDITOR-HANDOFF-V1F-003.mdSIGNED
Production authorization: NONE
CERTIFIED (production baseline): NO
Superseding adversarial audit: V1-remediation-20260826-independent-audit.md
T6B2 engineering re-verification: T6B2-engineering-reverification-20260826.md (ENGINEERING_ONLY)

Summary

Exact pair FE f7a20f7d… + BE 6ef1aa46… (tree 8bef7a61…) has green engineering rebind pass counts; demo DB remediated (V1F-004); production FE bleed restored (V1F-007); isolation FE immutability hardened (V1F-008). Demo UAT 16/16 after V1F-002 SPMB leaf-controller shadow fix. Human sign-off records GO_DEMO_RC for QG-18 documentation freeze on the bounded demo candidate path. Production remains NO-GO. CERTIFIED remains NO.

Served demo identities (verified 2026-08-26 post V1F-002)

Surface Commit / build Match candidate
Demo FE f7a20f7d… · fe-build-f7a20f7d-v1demo · path under /var/www/scola-releases/demo/ YES
Demo BE 6ef1aa46… · tree 8bef7a61… YES
Demo DB scoladev_demo UUID fad7c305-… YES
Production FE (restore) 1ffc7160… · fe-build-1ffc7160a652-rc11repro Restore baseline (not demo candidate)

Findings

ID Severity Finding Status
V1F-001 S2 T6B/T6B.2 independent human verdict SIGNED_GO
V1F-002 S2 Demo UAT SPMB admin registers Access denied DONE — UAT 16/16
V1F-003 S3 Human independent auditor review SIGNED_GO
V1F-004 S2 Demo DB stuck modules + cron skip REMEDIATED
V1F-005 S2 Stale rebind SHA REMEDIATED (pass counts); W03 → V1F-009
V1F-006 S3 Prefix parity optional FAIL 4/4 OPEN
V1F-007 S0 Production FE bleed REMEDIATED
V1F-008 S2 Isolation FE bleed false confidence REMEDIATED
V1F-009 S3 W03 evidence missing SHA/tree OPEN — full harness plan only
V1F-010 S2 HTTP worker DB-connect flakiness OPEN — prod restart deferred

Engineering / human verdict

GO_DEMO_RC for bounded demo / release-candidate engineering path (human-authorized chat 2026-08-26).

NO-GO for CERTIFIED production baseline / production promote / V1F-010 production restart.

Do not use this file as production promotion authority.