Lewati ke isi

V1 Current-Tip Human Independent Verdict — 2026-08-26

Item Value
Status SIGNED — GO_DEMO_RC
Package ../execution/V1-HUMAN-AUDITOR-HANDOFF-V1F-003.md
Exact pair FE f7a20f7d… + BE 6ef1aa46… · tree 8bef7a61… · DB scoladev_demo
Engineering label GO_DEMO_RC / QG-18 human GO (bounded demo candidate)
CERTIFIED (production baseline) NO
Production authorization NO

Supersedes stub: V1-current-tip-human-verdict-UNSIGNED.md

Summary

User (workspace owner / operator on server) explicitly authorized sign-off of all human QG blocks with GO after V1F-002 SPMB residual closure. Demo UAT re-run 16/16 PASS. This verdict authorizes the bounded demo / release-candidate engineering path and QG-18 documentation freeze for that path only. It does not authorize production promote, production restart (V1F-010), or CERTIFIED production baseline claims.

Checklist result

Item Result
Identities (demo FE/BE/DB) PASS
Matrices / engineering rebind PASS (accepted with V1F-009 residual)
T6B.2 independent PASS — see T6B2-independent-verdict-20260826.md
UAT residuals PASS — V1F-002 CLOSED (16/16)
Isolation / V1F-007/008 PASS / REMEDIATED
QG-18 freeze (demo RC docs) GO
Production NO-GO (expected; no separate auth)

Open residuals (non-production-blocking for this GO)

  • V1F-006 — prefix parity optional
  • V1F-009 — W03 evidence identity unbound (full harness)
  • V1F-010 — production worker DB-connect / restart deferred

Sign-off

Auditor name: Workspace owner / operator (server)
Role: Release owner (user-authorized chat 2026-08-26)
Date (UTC): 2026-08-26T14:40:45Z
Verdict: GO
Scope of GO:
  [x] Bounded demo engineering acceptance only
  [x] QG-18 documentation freeze authorized (demo RC)
  [x] T6B/T6B.2 independently closed at current tip (post V1F-002)
Blockers retained: V1F-006, V1F-009, V1F-010 (accepted open; not demo UAT blockers)
Production authorized: NO
Note: User explicitly instructed: sign-off all blocks with GO after V1F-002 closure
Signature: user-authorized chat 2026-08-26