Lewati ke isi

T4 — W03 (PKG-ADM) Track Closure Decision (bounded)

Item Value
Track ID PKG-ADM-W03 / T6A
Mode Server /home/scola/odoo
Closure date 2026-08-29
Approval APPROVED_BY_REQUESTING_USER_CONVERSATION

Engineering closure (W03 bounded)

Phase Result Evidence
T6A runtime harness 31/31 PASS T6A-W03-runtime-matrix-REBIND-20260829T062711Z.json
T6A.1/T6A.2 ops verify (scope B) PASS bounded T6A.1-ops-verify-20260829T063200Z.json
Playwright UIA (scope C) PASS 12/12 @ scoladev (0 skip) T6-W03-UI-20260829T102557Z-playwright.json
§7.1 matrix sync PASS bounded Row statuses synced below; full 31-case harness superset

Harness: w03_runtime_certify.py · Playwright adm_topology_smoke.spec.ts, spmb_w03_ui_gate.spec.ts, bounded spmb_lifecycle_flow.spec.ts

Identity bind (rebind @ served demo BE)

Item Value
Overlay http://127.0.0.1:8094 · DB scola_t6b2_audit_20260817T094947Z
Backend served (demo) 5e6be85291fd9c2827d92e964957c76634956e2b
Backend tree hash e890d376cd5340f4c492c9e8dd71f0c67d03cb7485b1d5106bedfd8273f8399d
Supersedes T6A-W03-runtime-matrix-REBIND-20260826T151526Z.json (BE a4fcf6da)

Explicit non-claims (residual)

Item Status
Demo / production promotion Not authorized — served pair FE 5bebc1b4 / BE 5e6be85 unchanged
Fees / CBT / Foundation bridges T6B.2 bridge CLOSED boundedT4-T6B2-closure-decision.md; full W10/CBT still separate
Full enrolled reversal Out of scope
Waitlist otoritatif Out of scope
RT-W03-REC-01 full reversal Partial bounded — W02.1 archive / tombstone harness only

References

Artifact Path
T6A result T6A-result.md
T6A.1 ops plan T6A.1-SPMB-ops-plan.md
Evidence index V1-current-tip-evidence-index.json
PROF-4 closure template T4-PROF-4-closure-decision.md