T4 — Post-SCORE Program Closure Decision

Item Value
Program ID POST-SCORE-W16-PROFILE-ASYNC
Mode Server /home/scola/odoo
Closure date 2026-08-29
Approval APPROVED_BY_REQUESTING_USER_CONVERSATION (Fase A engineering consolidation)
Predecessor T4-SCORE-closure-decision.md

Program engineering closure

Tiga jalur paralel dari V1-PLAN-POST-SCORE-W16-PROFILE-ASYNC.md lulus exit gate engineering masing-masing:

Track Denominator Result Closure doc
W16 Canonical News §5.3 — 11 row 11/11 PASS T4-W16-closure-decision.md
Profile DEC-013 §10.2 — JENJANG + TIMEZONE PASS bounded (PROF-2) T4-PROFILE-closure-decision.md
W02 Async DEC-008 subset §5.2 — IDM + REC 3/3 PASS · W02 36/36 T4-W02-ASYNC-closure-decision.md

Program bundle: V1-POST-SCORE-rebind-20260829T034800Z.json

Combined identity @ program close (Fase A)

Layer SHA / ID
FE develop (docs tip) 94d308c5
FE application (dist) 5bebc1b4 · build fe-build-5bebc1b475dd-mtdstizd
BE main (combined tip) 5e6be85
E1.2 regression (program gate) 29/29 PASS · T0-E1.2-20260829T034521Z @ BE 5e6be85

Per-track bundle evidence (SHA rule: satu track = satu bundle):

Track Bundle
W16 V1-W16-rebind-20260829T030500Z.json
Profile V1-PROFILE-rebind-20260829T033500Z.json
Async V1-W02-async-rebind-20260829T033500Z.json

Explicit non-claims (program level)

Status PASS bounded program tidak mencakup:

Item Status
PROMOTE_UAT / tenant UAT isolation DONE 2026-08-29 — all four UAT tenants @ demo pair; spansa NPSN 20527180 / jenjang smp
Production promotion Not authorized
Demo candidate refresh DONEV1-DEMO-POST-SCORE-PROMOTION-20260829T041200Z.json
PROF-3: GT-PROFILE-NON-EARLY-WIT, STAB-022 fixed-clock, W00 nav NOT RUN
W16 full legacy migration map (DEC-011) Deferred
Full DEC-008 master-data (MD-01–MD-03) Out of scope
FE UploadSiswa.vue progress UI (STAB-023) Not changed
Optional packages W03–W14, W20 Unchanged — track terpisah

Relationship to SC-CORE

SC-CORE closure (T4-SCORE-closure-decision.md) tetap valid untuk denominator W00/W01/W02 manual/W05. Post-SCORE program menutup deferrals yang tercatat di kolom «Named blockers/decisions» matrix §3 untuk W16, Profile §10.2, dan W02 async IDM/REC — tanpa memperluas klaim production atau UAT.

Approval record

2026-08-29 — Fase A consolidation (conversation):

  1. Mengonsolidasikan tiga track Post-SCORE sebagai engineering closed dengan bundle evidence terpisah.
  2. Mencatat E1.2 29/29 PASS @ BE combined tip 5e6be85 sebagai program regression gate.
  3. Tidak mengotorisasi demo refresh, UAT, atau production dalam gelombang ini.

References

Artifact Path
Program plan (closed) V1-PLAN-POST-SCORE-W16-PROFILE-ASYNC.md
Evidence index V1-current-tip-evidence-index.json
Matrix SSOT 07-release-test-matrix.md §5.2, §5.3, §10.2
E1.2 evidence T0-E1.2-20260829T034521Z-security-matrix.json