T4 — Post-SCORE Program Closure Decision¶
| Item | Value |
|---|---|
| Program ID | POST-SCORE-W16-PROFILE-ASYNC |
| Mode | Server /home/scola/odoo |
| Closure date | 2026-08-29 |
| Approval | APPROVED_BY_REQUESTING_USER_CONVERSATION (Fase A engineering consolidation) |
| Predecessor | T4-SCORE-closure-decision.md |
Program engineering closure¶
Tiga jalur paralel dari V1-PLAN-POST-SCORE-W16-PROFILE-ASYNC.md lulus exit gate engineering masing-masing:
| Track | Denominator | Result | Closure doc |
|---|---|---|---|
| W16 Canonical News | §5.3 — 11 row | 11/11 PASS | T4-W16-closure-decision.md |
| Profile DEC-013 | §10.2 — JENJANG + TIMEZONE | PASS bounded (PROF-2) | T4-PROFILE-closure-decision.md |
| W02 Async DEC-008 subset | §5.2 — IDM + REC | 3/3 PASS · W02 36/36 | T4-W02-ASYNC-closure-decision.md |
Program bundle: V1-POST-SCORE-rebind-20260829T034800Z.json
Combined identity @ program close (Fase A)¶
| Layer | SHA / ID |
|---|---|
| FE develop (docs tip) | 94d308c5 |
| FE application (dist) | 5bebc1b4 · build fe-build-5bebc1b475dd-mtdstizd |
| BE main (combined tip) | 5e6be85 |
| E1.2 regression (program gate) | 29/29 PASS · T0-E1.2-20260829T034521Z @ BE 5e6be85 |
Per-track bundle evidence (SHA rule: satu track = satu bundle):
| Track | Bundle |
|---|---|
| W16 | V1-W16-rebind-20260829T030500Z.json |
| Profile | V1-PROFILE-rebind-20260829T033500Z.json |
| Async | V1-W02-async-rebind-20260829T033500Z.json |
Explicit non-claims (program level)¶
Status PASS bounded program tidak mencakup:
| Item | Status |
|---|---|
PROMOTE_UAT / tenant UAT isolation |
DONE 2026-08-29 — all four UAT tenants @ demo pair; spansa NPSN 20527180 / jenjang smp |
| Production promotion | Not authorized |
| Demo candidate refresh | DONE — V1-DEMO-POST-SCORE-PROMOTION-20260829T041200Z.json |
PROF-3: GT-PROFILE-NON-EARLY-WIT, STAB-022 fixed-clock, W00 nav |
NOT RUN |
| W16 full legacy migration map (DEC-011) | Deferred |
| Full DEC-008 master-data (MD-01–MD-03) | Out of scope |
FE UploadSiswa.vue progress UI (STAB-023) |
Not changed |
| Optional packages W03–W14, W20 | Unchanged — track terpisah |
Relationship to SC-CORE¶
SC-CORE closure (T4-SCORE-closure-decision.md) tetap valid untuk denominator W00/W01/W02 manual/W05. Post-SCORE program menutup deferrals yang tercatat di kolom «Named blockers/decisions» matrix §3 untuk W16, Profile §10.2, dan W02 async IDM/REC — tanpa memperluas klaim production atau UAT.
Approval record¶
2026-08-29 — Fase A consolidation (conversation):
- Mengonsolidasikan tiga track Post-SCORE sebagai engineering closed dengan bundle evidence terpisah.
- Mencatat E1.2 29/29 PASS @ BE combined tip
5e6be85sebagai program regression gate. - Tidak mengotorisasi demo refresh, UAT, atau production dalam gelombang ini.
References¶
| Artifact | Path |
|---|---|
| Program plan (closed) | V1-PLAN-POST-SCORE-W16-PROFILE-ASYNC.md |
| Evidence index | V1-current-tip-evidence-index.json |
| Matrix SSOT | 07-release-test-matrix.md §5.2, §5.3, §10.2 |
| E1.2 evidence | T0-E1.2-20260829T034521Z-security-matrix.json |