Lewati ke isi

RC1.1 Engineering Closure Result

Engineering status: RC1.1 CLOSURE IMPLEMENTED — READY FOR FINAL INDEPENDENT IDENTITY RECONCILIATION
Not yet the final RC1-A verdict in this chronological artifact.

The two demo blockers identified after RC1-B are now corrected:

  1. /api/v1/attendance/daily/*, an INCOMPLETE_REMOVE surface outside certified W05, is denied by the backend product-surface gate with product_surface_unavailable. Empty HTTP-200 success is no longer accepted by the UAT harness.
  2. The evidence hash includes the complete scola_* runtime tree, including top-level service/controller files and manifests. A stale immutable release manifest is rejected.

Demo serves FE fd3aba83… and immutable BE fe40da6… / application tree b9353ec9…. A faculty-linked disposable teacher fixture produced 11/11 PASS, including W05 open/save/reload and negative scope/RPC cases. Cleanup removed assignments [44,45], sheet 354, its attendance line, sessions [1128,1129], faculties [116,117], and returned all UAT accounts to inactive state.

No production tenant was changed. GBN remains explicitly excluded and frozen on FE 3b7e5780… / BE 334db599….

Final RC1-A still requires a fresh Golden 29/29 matrix, corrected identity manifest, validator PASS, and a new independent verdict artifact. Historical RC1-independent-verdict.md remains preserved as the earlier RC1-B decision.