Lewati ke isi

Completion Review — Dokumentasi & Audit Production (Professional)

Tanggal review: 2026-06-11
Mode: server · workspace /home/scola/odoo
Referensi rencana: Dokumentasi & Audit Production Readiness (Bagian A–F)
Paket: SC-CORE + SC-LEARN + SC-ASSESS + SC-LIB


1. Verdict

Aspek Status Catatan
Artefak repo L2–L4 (Professional) Tuntas 9 domain + §7–§8, 14 role guide, 10 quick-start, portal MkDocs
Audit 9 domain P0 Tuntas Semua file audit 2026-06-11; MASTER + REMEDIATION sinkron
Remediasi kode global (GAP-01/02/03, UI) Tuntas (Professional) Wave A–D closed; residual proses QA/UAT
Evidence go-live klien Belum tuntas UAT sign-off + 3 skenario QA terjadwal — bukan gap dokumen
Perluasan audit non-Professional Siap di-scope Lihat ENTERPRISE-AUDIT-SCOPE.md

Kesimpulan: Implementasi rencana Professional sudah baik dan tuntas untuk sisi dokumentasi/audit repo. Go-live klien pertama masih menunggu Wave B (UAT/sign-off), bukan pekerjaan dokumen tambahan.


2. Checklist Bagian F — Deliverable Akhir

2.1 Repo scola-fe-v2/docs/

Deliverable Target Aktual Status
9 domain README (6+2 bagian) §1–§8 academic, absensi, spmb, keuangan, lms, cbt, perpustakaan, komunikasi, user-management (+ student-parent-data overlay)
User guide per-role ≥13 file 14 file di user-guide/per-role/
Quick Start workflow inti ~10 10 file di user-guide/quick-start/
Client implementation playbook 1 operations/client-implementation-playbook.md
MASTER-GAP-REGISTER 1 audit/production-readiness/MASTER-GAP-REGISTER.md
Audit per domain P0 9 9 file *-audit-2026-06-11.md
Configuration guides L3 9 domain operations/configuration-guides/
FAQ + Glossary 1+1 user-guide/faq.md, user-guide/glossary.md
Portal MkDocs docs.gcgscola.id mkdocs.yml + build-docs.sh --install
Rubric + template + backlog 3 AUDIT-RUBRIC, AUDIT-TEMPLATE, REMEDIATION-BACKLOG
QC gate evidence log QC-GATE-EVIDENCE-2026-06-11.md

2.2 Repo gcgscola/docs/

Deliverable Target Aktual Status
README modul Professional ≥15 15 modul + index
scola_identity_admin opsional bridge Ditambahkan 2026-06-11
API_ENDPOINTS_COMPLETE update delta File ada di repo root BE; delta incremental via domain SSOT ⚠️ Maintain on API change

2.3 Evidence Go-Live (proses)

Item Status Owner
UAT sign-off klien ⏳ Template siap Implementor + klien
SP-M3 SPMB manual UAT ⏳ Scheduled QA
AC-M3 grade publish E2E ⏳ Scheduled QA
CB-M3 question sync recon ⏳ Scheduled Guru/QA
QC gate server log QC-GATE-EVIDENCE

3. Checklist Bagian B — Exit Audit Gate

Kriteria Status
0 temuan Merah workflow inti
9 domain Hijau/Kuning dengan mitigasi ✅ (Akademik & Keuangan Kuning — training/docs)
GAP-01/02/03 closed (Professional)
GAP-UI-01/02 closed
Dokumentasi L2 §7–§8
Portal https://docs.gcgscola.id

4. Residual (bukan blocker dokumen)

ID Item Rekomendasi
Wave B UAT klien + 3 QA scheduled Jalankan sebelum go-live produksi klien pertama
LM-M2 LMS integration test coverage Post-launch
GAP-04 widen Dapodik live host staging Saat SC-DAP di-provision ke staging
GAP-08 FE prefix fallback shrink Saat BE domain metadata eksplisit

5. Keputusan Reviewer

Dokumentasi & Audit Production (Professional): APPROVED for repository completeness.

Langkah berikutnya yang benar secara risiko (selaras Bagian E):

  1. Tidak melebar audit penuh ke enterprise sebelum UAT Professional ditandatangani kecuali ada komitmen penjualan/add-on SC-FIN/SC-OPS/SC-DAP.
  2. Ya mulai Phase 6 scoping — dokumen ENTERPRISE-AUDIT-SCOPE.md + pilot evidence SC-DAP/SC-BOS sudah ada sebagai fondasi.
  3. Sync portal mingguan setelah edit docs/ (./scripts/build-docs.sh --install).